Dr Christian Hicks - Some References

Department of Mechanical, Materials and Manufacturing Engineering,
Stephenson Building, University of Newcastle upon Tyne, Newcastle NE1 7RU.

A BCD E FGH I JKL M NOP Q RST U VWX Y Z

A
Adcock D., Bradfield R., Halborg A and Ross C. (1998) Marketing Principles and Practice Third edition, Financial Times Management, London, ISBN 0-273-62798-8

Aho A.V,Kernigan B.W. & Weinberger P.J. (1988)
The AWK Programming Language
Addison Wesley ISBN 0-201-07981-X

Alexander A. and D. Young, 1996, Strategic Outsourcing, Long Range Planning 54(1), 116-119.

Anderson A.D., Hornthal P.R. & Huson J.V. (1980)
Unique Make-to-Order System Requirements
American Production and Inventory Control Society
Conference Proceedings 1980

Anecke N.A.C and Carrie A.S. (1984)
A Comprehensive Flowline Classification Scheme.
Int. J. Prod. Res. Vol. 22 part 2 pp281-297

APICS (1987)
APICS Dictionary
American Production and Inventory Control Society Inc.
ISBN 0-935406-90-S

B
Bachman C.W. (1969)
Data Structure Diagrams
Database Vol. 1 Part 2 (Summer 1969)

Bailey P., Farmer D., Jessop D., and Jones D. (1994) Purchasing Principles and Management, Seventh Edition, Pitman Publishing, London, ISBN 0-273-60319-1

Baker C.T. and Dzielinski B.P. (1960)
Simulation of a Simplified Job Shop
Management Science, Vol. 6 pp311

Barber K.D. (1983)
Factors Influencing the Selection of Computer Aided Production Control Systems for Defined Company Classifications.
Ph.D. thesis UMIST

Barber K.D. & Hollier R.H (1986)
The Use of Numerical Analysis to Classify Companies According to Production Control Complexity
Int. J. Prod. Res. Vol 24 part 1 pp203-222

Barber K.D. & Hollier R.H. (1986a)
The Effects of Computer Aided Production Management Systems on Defined Company
Int. J. Prod. Res. Vol 24 part 2 pp311-327

Belt B. (1976)
Integrating Capacity Planning and Control
Production and Inventory Management, first quarter V17 pp9-25

Benjamin R.I. and Wigard R.T. (1995), “Electronic Markets and Virtual Value Chains on the Information Highway”, Sloan Management Review, 36(2) pp62-72

Birtwistle G.M. (1979)
Discrete Event Modelling on Simula
MacMillan, London.

Black S.C., Chiles V., Lissamen A.J. and Martin S.J. (1996) Principles of Engineering Manufacture Third Edition, Arnold, London, ISBN 0-340-63195-3

Blackburn J.D. Kropp D.H. and Millen R.H. (1985)
MRP System Nervousness: Causes and Cures
Engineering Costs and Production Economics Vol 9. pp141-146

Bertrand J.W.M and Mustslag D.R. (1993)
Production Control in Engineer to Order Firms
Int. J. Prod. Econ. 30-31 pp3-22

Blackstone J.H., Phillips D.T. and Hogg G.L. (1982)
A State of the Art Survey of Manufacturing Job Shop Operations
Int. J. Prod. Res. Vol. 20 Part 1 pp27-45

Boe W J and Cheng  C H  (1991)
A Close Neighbour Algorithm for Designing Cellular Manufacturing Systems
Int. J. Prod. Res. Vol. 29 part 10 pp2097-2116

Booze Allan Hamilton (1984), Survey Data

Boyer R., 1987, Labour Flexibility: Many Forms, Uncertain Effects, Labour and Society 12, 107-129.

Bravoco R.R. and Yadev S.B. (1985a)
Requirements Definition Architecture - An Overview
Computers in Industry 6 (1985) pp237-251
Elsevier Science Publications B.V. (North Holland)

Bravoco R.R. and Yadev S.B. (1985b)
A Methodology to Model the Functional Structure of an Organisation
Computers in Industry (1985) Vol. 6 pp345-361
Elsevier Science Publications B.V. (North Holland)

Bravoco R.R. and Yadev S.B. (1985c)
A Methodology to Model the Information Structure of an Organisation
Journal of Systems and Software Vol. 5 pp59-71

Bravoco R.R. and Yadev S.B. (1985d)
A Methodology to Model the Dynamic Structure of an Organisation
Information Systems Vol. 10 Pt 3 pp299-317

Bresnen M., 1996, An Organisational Perspective on Changing Buyer-Supplier Relations: A Critical Review of the Evidence Organisation, 3(1), 121-146.

Broadbent M and Weill P (1997),”Management by Maxim: How Business and IT Managers can Create IT Infrastructures”, Sloan Management Review, 38(3), pp77-92.

Browne J. Harhen J. and Shivnan (1988)
Production Management Systems: A CIM Perspective
Addison Wesley, England. ISBN 0-201-17820-6

Burbidge J.L. (1971)
Production Planning
Hienemann, London.

Burt D.N. and Doyle M.F.,  1993, The American Keiretsu, Business One, Irwin, Homewood, IL.

Byrd T.A., Cossick K.L. and Zmud R.W. (1992), “A Synthesis of Research on Requirements Analysis and Knowledge Acquisition Techniques”, MIS Quarterly, 16(1), pp117-138.

C
Caron F. and Fiore A. (1995)
"Engineer to Order" Companies: How to Integrate Manufacturing and Innovative Processes
Int. J. Proj. Man. V13 No. 5 pp313-319

Cass T. (1973)
Statistical Methods in Management
Cassel, London.

Checkland P.B. (1972)
Towards a system based methodology for solving real world problem solving
Journal of Systems Engineering Volume 3 part 2

Checkland P.B (1981)
Systems Theory, Systems Practice
John Wiley & Sons Ltd. (Chapter 2 and 3)

Chen P.P. (1976)
The Entity - Relationship Model - Towards a Unified View of Data
ACM Transactions on Database Systems, Vol. 1 No. 1 (March)

Churchman C.W., Arkoff, and E.L. Arnoff (1959)
Introduction to Operations Research
Wiley, New York.

Clarke S. (1988)
Aspects of the Design and Control of Manufacturing Systems Subject to Demand Uncertainty
PHd thesis, Aston University, England.

Cochran J.K. (1987)
Techniques for Ascertaining the Validity of Large Scale Simulation Models
Int. J. Prod. Res. Vol. 25 No. 2 pp233-244

Constable C.J. and New C.C. (1976)
Operations Management, a Systems Approach Through Text and Cases
Wiley, London.

Cowan S.S. and Middlaugh J.K (1988),”Designing Effective Financial and Control Systems”, Long Range Planning, 21(1), pp83-92.

Conway R.W. (1965)
Priority Dispatching and Job Lateness in a Job Shop
J. Ind. Engng, Vol. 16 pp123

Conway R.W. (1965a)
Priority Dispatching and Work in Progress Inventory in a Job Shop
J. Ind. Engng, Vol 16 pp228.

Corke D. (1985)
Computer Aided Production Management Systems
The Institution of Production Engineers. ISBN 0 85510 028 1

Cutts G. (1991)
Structured Systems Analysis and Design Methodology
Blackwell, England. ISBN 0-632-02831-9

D
Davies O., 1985, Strategic Purchasing, in Farmer D. (ed) Purchasing Managing Handbook, Gower, London.

Davis G.B. (1982),”Strategies for Information Requirements Determination”, IBM Systems Journal, 21(1), pp4-32.

E
Electricity Association (1997) http://www.electricity.org.uk/uk_inds/stats.htm

Elvers D.A. (1974)
The Sensitivity Analysis of the Relative Effectiveness of Job Shop Dispatching Rules with Various Arrival Distributions
A.I.I.E. Trans, Vol. 6 pp41

Eppinger S.D., Whitney, Smith D.E. and Gebala D.A (1994)
A Model Based Method for Organising Tasks in Product Development
Research in Engineering Design V6 pp1-13

F
Farmer D.H., 1984, Competitive Analysis: A Must for Effective Purchasing Management, Long Range Planning, June.

Fishman G.S. (1978)
Principles of Discrete Event Simulation
John Wiley, London.

Frizelle G.D.M. (1989)
OPT in Perspective
Advance Manufacturing Engineering Vol 1 Jan 1989, Butterworth

Frizelle G.D.M. (1989a)
A Classification and Measurement Structure for Manufacturing Plants
Internal Paper,
Cambridge University

G
Galbraith J. (1973)
Designing Complex Organisations
Addison Wesley, UK
ISBN 0-201-02559-0

Gallagher C.C. and Knight W.A. (1986)
Group Technology Production Methods in Manufacture
E. Horwood, Chichester, England ISBN 0853-126097

Gelders L.F. and Van Wassenhove L.N. (1981)
Production Planning: A Review
European Journal of Operations Research, Vol.7 pp101-110

Gelders L.F. and Van Wassenhove L.N. (1982)
Hierarchical Integration in Production Planning: Theory and Practice
Journal of Operations Management 3/1 pp27-35

Giles R.S. and Capel J.W. (1994), Finance and Accounting Third Edition, The MacMillan Press Ltd., London, ISBN 0-333-615850

Godfrey P.W. and Struthers K. (1985)
Material Flow is Key to Productivity
Chartered Mechanical Engineer, May 1985.

Goldberg A . and Robson D. (1983)
Smalltalk-80
The Language and it Implementation
Addison Wesley, London.

Goldratt E.M. (1981)
The Unbalanced Plant
Proc. APICS annual conf. 1981 pp36-51

Grogono, Peter (1984)
Programming in Pascal (2nd Edition)
Addison Wesley.

Grover, V.; Teny, J.; Fielder, K. Information Technology Enables Business Process Redesign: An Integrated Planning Framework; 1993 .

Goold M and Campbell A. (1987)
Strategies and Styles: the Role of the Centre in Managing Diversified Corporations
Blackwell

H
Harhalakis G. (1986)
Engineering Changes for Make to Order Products: How an MRPII System Should Handle Them
Engineering Management International Vol 4. pp19-36

Harhalakis G. and Yang S.S. (1988)
Integration of Network Analysis With MRP in a Make to Order Manufacturing Environment
Engineering Costs and Production Economics Vol 14 pp47-59

Harland C.M., 1996, Supply Chain Management: Relationships, Chains and Networks, British Journal of Management, 7, Special Issue, 63-80.

Harrison M (1996)
Integrating Project Planing and Material Requirements Planning
Undergraduate Thesis
University of Newcastle upon Tyne

Heller D. (1990)
XView Programming Manual
O'Reilly & Associates, Inc. ISBN 0-937175-52-8

Henderson J.C and Vankataram N. (1993),”Strategic Alignment: Leveraging Information Technology for Transforming Organisations”, IBM Systems Journal, 32(1), pp4-16.

Hendry L.C. (1990)
Decision Support System to Manage Delivery and Manufacturing Lead Time in Make to Order Companies
PhD Thesis, Lancaster University

Hendry L.C. and Kingsman B.G. (1989)
Production Planning Systems and their Applicability to Make to Order Companies
European Journal of Operational Research Vol. 40 pp1-15

Hendry L.C. and Kingsman B.G. (1991)
Job Release: Part fo a Hierarchical System to Manage Manufacturing Lead Times in Make to Order Companies
J. Opl. Res. Soc. Vol.42 No.10 pp871-883

Hendry L.C. and Kingsman B.G. (1993)
Customer Enquiry Management: Part of a Hierarchical System to Control Lead Times in Make to Order Companies
J. Opl. Res. Soc. Vol. 44 No. 1 pp61-70

Hicks C. (1988)
The Application of Computer Aided Production Management Systems in Make to Order
Manufacturing - First Year Report
Internal Working Paper
University of Newcastle upon Tyne.

Hill T. (1986)
Manufacturing Strategy
MacMillan Education Ltd., London ISBN 0-333-39477-1

Hines S (1996a)
Development of a Graphical User Interface for MTO Simulation Model
Unpublished working paper, University of Newcastle upon Tyne.

Hines S (1996b)
Development of a Planning Tool for MTO Manufacturing
Unpublished working paper, University of Newcastle upon Tyne.

Hines S (1996c)
Development of a Tool for Managing Batch Simulation Runs
Unpublished working paper, University of Newcastle upon Tyne.

Hinrichs J. (1994)
Cluster Analysis: An Approach to Identifying Manufacturing Cells
Undergraduate Thesis, University of Newcastle upon Tyne.

Ho C. (1989)
Evaluating the Impact of Operating Environments on MRP System Nervousness
International Journal of Production Research Vol. 27 pp1115-1135

Howe D.R. (1983)
Data Analysis for Data Base Design
Edward Arnold (Publishers) Ltd. ISBN 0-7131-3481-X

Hutchinson G.K. (1975)
Introduction to the Use of Activity Cycle Diagrams as a Basis for System Decomposition and Simulation
Simuletter, (ACM Sigsim) Vol. 7, Part 1 pp15-23

J
Jackson J.R. (1957)
Networks of Waiting Lines
Ops. Res. 5, pp518

Jackson M., 1983, Systems Development, Prentice Hall, New Jersey.

Jarillo J.C., 1993, Strategic Networks: Creating the Borderless Organization, Butterworth-Heinemann.

Johnson A. and Montgomery D.C. (1974)
Operations Research in Production Planning, Scheduling and Inventory Control
Wiley, New York.

Johnson H.J. and Kaplan R.S. (1987) Relevance Lost: The Rise and Fall of Management Accounting, Harvard Business School Press.

Johnson K. (1990)
Implementing Optimised Production Technology (Implementing OPT)
IFS Bedford, England. ISBN 1-85423-082-4

K
Kanet J.J. (1984)
Towards Understanding Lead Times in MRP Systems
Production and Inventory Management, Third Quarter 1984 pp32-46

Kanet J.J. and Addlesberger H.H. (1987)
Expert Systems in Production Scheduling
European Journal of Operational Research Vol.29 pt. 1 pp51-59

Kast F.E. and Rosenzweig J.E. (1970)
The Modern View: A Systems Approach
McGraw-Hill Inc.

Keller P (1995)
Development of a WWW Manual for MTO Simulation Model
Undergraduate Thesis, University of Newcastle upon Tyne

Kernigan B.W & Ritchie D.M. (1988)
The C Programming Language
Prentice Hall International
ISBN 0-13-110370-9

King J. R. (1980)
Machine-Component Grouping  in Production Flow Analysis: An Approach using a Rank Order Clustering Algorithmn
Int. J. Prod. Res. Vol. 18, pp213-232

King J.R. and Spachis A.S. (1980)
Scheduling: Bibliography and Review.
Int. J.  Physical Distribution and Materials Management
Vol. 10 Part 3 pp105-132

Kingsman B.G. Tatsiopoulos I.P and Hendry L.C. (1989)
A structural methodology for managing mnufacturing lead time in make to order companies
European Journal of Operational Research Vol 40 pp196-209

Kiviat P.J. (1967)
Digital Computer Simulation: Modelling Concepts
The Rand Corporation
Santa Monica
Calif

Knuth D.E. (1981)
Seminumerical Algorithmns, The Art of Computer Programming
2nd Edition Vol 2, Addison Wesley

Konijnendijk P.A. (1994)
Coordinating Marketing and Manufacturing in ETO Companies
Int. J. Prod. Econ. V37 pp19-26

Kreutzer W. (1986)
System Simulation Programming Languages and Styles
Addison Wesley ISBN 0-201-12914-0

Kumpe T. and  Boljwin P., 1988, Manufacturing: The New Case for Vertical Integration, Harvard Business Review, March-April, 75-81.

L
Lamming R., 1993, Beyond Partnership: Strategies for Innovation and Lean Supply,
Printice Hall International, Hemel Hemsted.

Lance G N  and  Williams W T (1967)
A General Theory of Classificatory Sorting Strategies 1. Hierarchical Systems
Computer Journal, Vol. 9 pp373-380

Landvater D.V. and Grey C.D. (1989) MRPII Standard System: A Handbook for Manufacturing Software Survival, Oliver Wight Limited Publications, USA, ISBN 0-939246-12-0

Launi J.D. (1991),”A Structured Methodology for off-the-shelf Software Implementation”, Journal of Systems Management, October, pp6-9.

Law A.M. and Kelton D. (1982)
Simulation Modelling and Analysis
McGraw Hill, London.

Lewis I and Talalayeusky A (1997), “Logistics and Information Technology: A Co-ordination Perspective”, Journal of Business Logistics, 18(1) pp141-157

M
Marucheck A.S. and McClelland M.K. (1986)
Strategic Issues in Make to Order Manufacturing
Production and Inventory Management Vol. 27 pt2 pp82-95

Mather H. and Plossl G. (1978)
Priority fixation versus throughput planning
Production and Inventory Management 3rd Quarter 1978.

Matthyssens P. and Van den Bulte C., 1994, Getting Closer and Nicer: Partnerships in the Supply Chain, Long Range Planning, 27(1), 72-83.

Ministry of Labour
The Ministry of Labour Gazette
London H.M.S.O.

Mitrani I. (1982)
Simulation Techniques for Discrete Event Systems
Cambridge University Press. ISBN 0 521 23885 4

Monniot J.P. Rhodes D.H. Towill J.G. and Waterlow J.G. (1987)
Report of a Study of Computer Aided Production Management in UK Batch Manufacturing
International Journal of Operations and Production Management Vol. 7 Part 2 pp2-57

Montgomery D.C. (1991)
Design and Analysis of Experiments
John Wiley & Sons ISBN 0-471-52994-X

Muntslag D.R. (1994)
Profit and Risk Evaluation in Customer Driven Engineering and Manufacture
Int. J. Prod. Econ. V36 pp97-107

Murphy D.N.P. and Ma L. (1991)
MRP with uncertainty: a review and some extensions
International Journal of Production Economics Vol 25 pp51-64

N
Naylor T.H. and Finger J.M. (1967)
Verification of Computer Simulation Models
Management Science Vol. 14 pp 92

Neelamkavil F. (1986)
Computer Simulation and Modelling
John Wiley and Sons. ISBN 0-471-91129-1

New C.C. (1976)
Managing Manufacturing Operations
British Institute of Management
Report Number 35, London.

Nishiguchi T.,1994, Strategic Industrial Sourcing: The Japanese Advantage, Oxford University Press.

O
Office of National Statistics (1996), Production and Construction Statistics (PACSTAT), Office for National Statistics, Cardiff Road, Newport, NP9 1XG.

Orlicky J.A., Plossl G.W. and Wight O.W. (1973)
Structuring the Bill of Materials for Material Requirements Planning
APICS 1973 p56-80

Ousterhout J.K (1994)
TcL and the Tk Toolkit
Addison Wesley, Reading Massachusetts.
ISBN 0-201-63337-X

P
Parnaby J. (1975)
Concept of a Manufacturing System
Int. J. Prod. Res. Vol 17 No 2 pp123-135

Peterson J.L. (1977)
Petri Nets
Computing Surveys Vol. 9 No. 3 pp223-252

Platts K.W. and Gregory M.J. (1990)
Manufacturing Strategy in the Process of Strategy Formulation
International Journal of Operations and Production Management
Vol. 10 part 9 pp 1-27

Platts K.W (1988)
Manufacturing Audit in the Context of Strategy Development
Internal Paper
Cambridge University

Plossl G.W and Wight O.W. (1973)
Capacity Planning and Control
Production and Inventory Management 3rd Quarter 1973 pp31-67

Porter M.E. (1980) Competitive Strategy: Techniques for Analysing Industries and Competitors, The Free Press.

Press W.H. Flannery B.P. Teukolsky S.A. & Vetterling W.T. (1989)
Numerical Recipes The Art of Scientific Computing
Cambridge University Press.

Puto C., Patton W. and King R., 1985,  Risk Handling Strategies in Industrial Vendor Selection Decisions, Journal of Marketing, 49, Winter 89-98.

R
Rayport J.F. and Sviokla J.J. (1995), “Exploiting the Virtual Value Chain”, Harvard Business Review, 73(6), pp75-85.

Ross D.T. and Schoman K.E. (1977)
Structured Analysis for Requirements Definition
IEEE Transactions on Software Engineering
Vol SE3 No.1 January 1977

Ross D.T. (1977)
Structured Analysis (SA): A Language for Communicating Ideas
IEEE Transactions on Software Engineering
Vol SE3 No.1 January 1977

Rowan T.G. and Chatterton A.N. (1974)
Production Systems Audit
The Production Engineer, February 1974

S
SAS (1988)
SAS Manuals (Release 6.03),
SAS Institute Inc. Box 8000 Cary, NC, USA.

Schlesinger S.  (1980)
Terminology for Model Credibility
Simulation, Vol. 32 pp 103

Schuben L.W. (1980)
Establishing the Credibility of Simulations
Simulation Vol.34 pp101-105

Shimonyashiro S., Isoda K. and Awane H. (1984)
Input Scheduling and Load Balance Control for a Job Shop
Int. J. Prod. Res. Vol. 22 No 4. pp597-605

Shingo, S. (1985),”A Revolution in Manufacturing: the SMED System”, The Productivity Press, USA

Skinner W. (1974)
The Focused Factory
Harvard Business Review, May/June 1974.

Spekman R.E., 1981, A Strategic Approach to Procurement Planning, Journal of Purchasing and Materials Management, Winter.

Spekman R.E., Kamauff W. and Salmond D.J., 1994, At Last Purchasing is Becoming Strategic, Long Range Planning,.27(2), 76-84.

Stalk G. (1988) “Time – the next source of competitive advantage”, Harvard Business Review, 66(4) pp.41-51.

Stalk G and Hout T.M. (1990) “Competing Against Time”, The Free Press, New York.

T
Tatsiopoulos I.P. and Kingsman B.G. (1983)
Lead Time Management
European Journal of Operational Research Vol 14 pp351-358

Tay M.S. (1995)
Capacity Planning in Make to Order Manufacturing
Unpublished undergraduate project report
University of Newcastle upon Tyne

Tobin N.R., Mercer A.L. and Kingsman B.G. (1987)
A Study of Small Subcontract and Make to Order Firms in Relation to the Quotation for Orders
Inj. J. Op. Prod. Man. Vol.8 No. 6 pp46-59

Tracy M and Wiersema F, (1993)
Customer Intimacy and Other Value Disciplines
Harvard Business Review Vol. 71 No. 1 pp 84-93

Turnbull P., Oliver N and B. Wilkinson, 1992, Buyer Supplier Relations in the UK Automotive Industry: Strategic Implications of the Japanese Manufacturing Model, Strategic Management Journal, 13, 159-168.

Turner P.J. (1992)
ACE/gr User's Manual
Centre for Coastal and Land Margin Research
Oregon Graduate Institute for Graduate Technology.
(EMail pturner@amb4.ccalmr.ogi.edu,
software available on ftp.ccalmr.ogi.edu [129.95.72.34] in CCALMR/pub/acegr)

U
U.S. Air Force (1981a)
Integrated Computer Aided Manufacturing (ICAM) Architecture Part II, Volume IV Functional Modelling Manual (IDEF0)
AFWAL-TR-81-4023 Wright Patterson Air Force Base, Ohio.

U.S. Air Force (1981b)
Integrated Computer Aided Manufacturing (ICAM) Architecture Part II, Volume V Information Modelling Manual (IDEF1)
AFWAL-TR-81-4023 Wright Patterson Air Force Base, Ohio.

U.S. Air Force (1981c)
Integrated Computer Aided Manufacturing (ICAM) Architecture Part II, Volume VI Information Modelling Manual (IDEF2)
AFWAL-TR-81-4023 Wright Patterson Air Force Base, Ohio.

V
Van Horn R.L. (1971)
Validation of Simulation Results
Management Science Vol. 17 No. 5 January 1971

Vaughan R., 1996, Innovating to Compete,  Supply Management, September, 46-47.

Venkatesan R., 1992, Strategic Sourcing: To Make or Not to Make, Harvard Business Review November-December, 1992.

Vollman T.E., Berry L.B. and Whybark T.C. (1989)
Manufacturing Planning and Control Systems
Irwin, Boston, US. ISBN  1-55623-015-X

Vollman T.E., Berry L.B. and Whybark T.C. (1992)
Manufacturing Planning and Control Systems
Irwin, Boston, US. ISBN  0-256-08808-X

Voss C.A. (1987)   (658.5-JUS)
Just in Time Manufacture
IFS Publications, Bedford. ISBN 0-948507-49-7

Voss C.A. (1980)
Measuring Make to Order Delivery Performance
Production and Inventory Management Vol. 20 No. 2 p22-34

Voss C.A. and Harrison A.  (1986)
Strategies for Implementing JIT
Just in Time Manufacture
IFS (Publications) Ltd, UK.
ISBN 0-948507-01-2

Voss C.A. (1989)
JIT's Here to Stay
IFS Publications, Bedford.

W
Wagner H.M. and Whitin T. (1985)
Dynamic Version of the Economic Lot-Sizing Model
Management Science Vol 5. No.1 pp86

Wall A.M. (1994)
Cluster Analysis
Unpublished working paper
University of Newcastle upon Tyne.

Wall A.M. (1994)
Modelling Uncertainties in Simulation
University of Newcastle upon Tyne.

Westhues T. (1994)
Simulation of Flow and Batch Manufacturing Processes
Unpublished Undergraduate Project Thesis,
University of Newcastle upon Tyne.

Westhues T. (1994)
Modelling Product Structure
Unpublished Undergraduate Project Thesis,
University of Newcastle upon Tyne.

Westwick C.A. (1973)
How to Use Management Ratios
Gower, London.

Wetherbe J.C. (1991),”Executive Information Requirements: Getting it Right”, MIS Quarterly, 15(1), pp51-65

Whybark D.C. and Williams J.G. (1976)
Material Requirements Planning Under Uncertainty
Decision Sciences Vol 7 pp595-606

Wickman B. and Hill D. (1987)
Building a Random Number Generator
Byte, March 1987.

Wirth N. (1971)
The Programming Language Pascal
Acta Informica, Springer-Verlag
Vol.1 No.1 pp35-63.

Woodward J. (1965)  331.014-WOO
Industrial Organisation: Theory and Practice.
Oxford University Press, Oxford.

Wortman J.C. (1992)
Production Management Systems for One-of-a-kind Products
Computers in Industry 19(1992) pp79-88

Wortmann H. (1995)
Comparison of Information Systems for Engineer to Order and Make to Stock Situations
Computers in Industry V26 pp261-271

Chris Hicks' Home Page


© Dr Christian Hicks, Department of Mechanical, Materials and Manufacturing Engineering, University of Newcastle upon Tyne