The house trenches have been dug. At the bottom right hand corner they are 1.4metres deep
because they are close to a sycamore tree.

Here they are pegged out, the top of the pegs is to be the top of the concrete foundation.
They are measuring how much concrete they will need, it is 15 cubic metres
three lorry loads,
starting at 11:30 Friday 21st October.
Oh! that is my shadow of me taking the photograph from the top of the spoil heap.

These are the garage foundations. Building regulations inspector, Brian Moore came at 11:45 and gave the OK.