Things Picking Up, Floorboards Going Down.

15th August 2006. Weather much cooler, I don't like it too hot.

Tony is busy upstairs laying floorboards. John is busy downstairs supplying them.


I am busy downstairs fixing the under floor heating pipes below the floor joists.
Here you can see the problem. Where ever a pipe went through a slot in a floor joist and did not lay hard down,
a granule or two of Lytag got into the slot and forced the UFHP above the floor joist.


Here is the UFHP fixed down and Lytag laid around it.


Tony is fixing cladding and floor boards upstairs wearing no shoes on the raw floorboards.


John is at ground floor selecting and carrying wood, cutting to Tony's instructions,
and delivering to Tony to fix.


Here is the South facing bedroom, we think we might like this one.


And here is the North bedroom. It overlooks the lane between the terraces.