| QUIT | PREVIOUS | NEXT |

Crossing No 12. Upstream view, getting this involved clambering through a bramble patch.
Bobby didn't follow me, he had no footwear.

The bridge is quite old, but substantial, strong enough to take a tracked vehicle.

Downstream view.
Just downstream further this is the view of the north flood plain before:
and after 1018mm (4") of rain had fallen on the 25th September 2012.
| QUIT | PREVIOUS | NEXT |